MAC were appointed PSCS to deliver the complete site development package for an 87-unit residential development, working on a full supply-and-fit basis.

From the initial greenfield strip, our team managed and delivered the key infrastructure, earthworks, drainage, utilities and road construction required to transform the site into a fully serviced residential development.

Our Scope of Works

The project included:

  • Site preparation and earthworks – stripping and removal of topsoil from the main site, with material disposed of off site.
  • Temporary access infrastructure – construction of approximately 300m of temporary haul road, including base kerbing and tarmac.
  • Road and plot formation – importation, placement and compaction of approximately 30,000 tonnes of 808 stone to form roads and housing plots.
  • Drainage infrastructure – installation of the main stormwater and foul drainage networks.
  • Attenuation systems – installation of two attenuation systems as part of the site’s stormwater management infrastructure.
  • Box culverts – installation of two box culverts to facilitate the site’s drainage and infrastructure requirements.
  • Utilities – installation and commissioning of the complete utility infrastructure, including:
    • Watermain
    • ESB
    • Virgin Media
    • Eir
    • Public lighting
  • Road construction – installation of base kerbing and base tarmac throughout the development.

A Complete Site Development Solution

By delivering the works on a supply-and-fit basis, MAC provided the client with a single, experienced contractor capable of delivering multiple elements of the site infrastructure under one package.